The plunge pool is usually used to dissipate energy under high dam.
高坎下游泄洪常常采用水垫塘消能,挑跌水流可能对塘底产生巨大的冲击.
互联网
The high Dam at Aswan was completed in 1970.
阿斯旺的高坝是于1970年完工的.
互联网
Say something about the Aswan High Dam, using the information from the text.
教师用投影仪打出以下表格, 学生利用课文中所提供的信息描述阿斯旺大坝.
互联网
The adoption of ship lift is also a very effective mean for high dam.
升船机也是解决高坝通航一种非常有效的手段.
互联网
When completed, the 600 - foot - high dam will be the largest hydroelectric project in the world.
工程完工时, 600英尺高的大坝将成为世界上最大的水电站.
互联网
High dam toe area is the focus of reinforcement design.
高拱坝坝趾区域是加固设计的重点关注区域.
互联网