During the air pressure test, boosting shall be carried out slowly and step by step.
气体压力试验时, 应逐步缓慢增加压力.
互联网
Installed coil pipes are checked by 2.5 Mpa air pressure test to ensure of no leakage.
装配好的盘管要经过2.5Mpa的空气压力试验检漏,以确保无泄漏.
互联网
The pipe system had passed the acceptance air pressure test performed by the installing contractor.
管道系统已经通过了安装公司所做的空气压力测试.
互联网