This paper describes the safety monitoring design for HS concrete face rockfill dam.
阐述了花山面板堆石坝的监测设计.
互联网
Campos Novos is the world's third dam built with a concrete face filled in with rock.
新田是世界上第三高的水坝,表面为混凝土内部则填以岩石所造的水坝.
互联网
Concrete face rockfill dam ( CFRD ) is a new type of dam with very developing future.
混凝土面板堆石坝是极有发展前途的一种新坝型.
互联网
Moreover, a new type sealing structure of peripheral joint of concrete face is introduced.
此外, 还介绍了我们研制成功的新型面板周边逢双金属波纹止水结构.
互联网
The reinforced concrete face - slab is adopted as impervious body by Long Tan RCC Dam.
龙滩碾压混凝土重力坝采用钢筋混凝土面板作为防渗体.
互联网